Nope..no photos. Nothing looks any different in the house; all the work has been on the work table, except for a little painting in the Master bedroom.
I started on what was to be the transom windows and had to change the plan. The Houseworks doors are bigger/taller than the original doors. Allowing for the higher size and the frame of transom windows, I would have been left with too small an area for a window, so it's becoming just wall. I've finished the painting of the blue side and, today, will work on the other sides' colors, maybe get them fitted into the space.
Yesterday, I bought the last pack of baseboard at Hobby Lobby; will go back today for either the fireplace or crown moulding. Clear vellum was 1/2 off and that's what I'm going to use for "stained glass" in the French doors and oval windows. I need fresh ink cartridges for the printer, which is fine. I have plenty of time and I'll need it still for researching. Someone told me about doing this and I am spending a lot of time looking for the right look.
I'm dragging in the Garfield, working more in other areas of my big house, but I am getting piles of trim pieces stained, varnished, and ready to install. I like to let it pile up and then just have a day with installing.
While it's still in the future, I'm thinking about this tower that is in the front of this house. I think I want it to have a fieldstone look on the entire outside of the tower and in the interior of the third floor, so I'm cruising the supplies needed for that. If I'm going to do it, I need to before I work inside it, which is not all that far away, plus I should do it before I add the siding, which IS a while away.
To be continued........................
Tuesday, October 28, 2008
Subscribe to:
Posts (Atom)